MSC Miami Cruise Terminal

Before ImageAfter Image

Commercial/Transportation

Miami,FL

490,000 SF Terminal / 1,200,000 SF Garage

Completion Date: 2025

For the last 3+ years, IDEA AEC Engineering team has been performing Design and Project Management services on this nearly completed masterpiece of Architecture. Alongside multiple talented industry professionals, we continue to accomodate the needs of this project as it heads towards completion for the end of this year.

A multi-vessel cruise terminal capable of serving a total of 36,000 cruise ship passengers daily. The facility consists of 490,000 sf of interior space and 1,200,000 sf garage (6-Levels). A boarding concourse extends east approximately 3,000 feet to allow for berthing of three (3) cruise vessels simultaneously.

The Terminal’s programming includes but is not limited to: check-in, validation, screening, waiting lounges, office terrace, passenger bridge concourse, baggage claim, restrooms, U.S.A customs and border protection areas, VIP lounges, etc. Sustainable goals include LEED Silver certifcation.

Project Features

MECHANICAL PLANTS

SMOKE CONTROL SYSTEM

ELECTRIC VEHICLE CHARGING

ART IN PUBLIC PLACES

SHORE POWER

LEED CERTIFICATION

Services

  • MEP-FP Project Management
  • Construction PM Services
  • Mechanical
  • Electrical
  • Fire Alarm Design

Make sure to follow us to get the latest updates: